Finished - Project Gera foil roof
In this project with a size of 558.08 kWp, only PMT substructure was installed on the roof:
- Substructure PMT EVO 2.0 east/west 10° for flat roof
- Substructure PMT Flat Direct incl. Solmont for a foil roof with 9° inclination
- Substructure PMT Flat Direct incl. ridge coupling
And because there was still room on a greenfield site, another
Open space plant with 391.68 kWp plant capacity installed.
A very nice project which reflects our flexibility during the installation very well.