Gumpersdorf, Germany

Project:Gumpersdorf, Germany
Partners:Münch Energie, Germany
Performance:6,499.20 kWp
Mounting system:Carpenter South 20°

We built the 6.5 MWp PV park for our strongest German partner. 16.248 pcs. Jinko Solar modules were wired with Sungrow SG250 HX inverters.
The project, which was implemented as a PPA plant, now feeds green electricity into the grid.

Thank you very much for good cooperation and strong trust!

The scope of services for this project was

  • driving the posts and installing the substructure
  • Module assembly and their strung together
  • Installation of the inverters, DC-side connection
  • Earthworks and the laying of the DC and AC cables
  • Foundations for the transformers
  • Measurement of the complete area