Gumpersdorf, Germany
Project: | Gumpersdorf, Germany |
Partners: | Münch Energie, Germany |
Performance: | 6,499.20 kWp |
Mounting system: | Carpenter South 20° |
We built the 6.5 MWp PV park for our strongest German partner. 16.248 pcs. Jinko Solar modules were wired with Sungrow SG250 HX inverters.
The project, which was implemented as a PPA plant, now feeds green electricity into the grid.
Thank you very much for good cooperation and strong trust!
The scope of services for this project was
- driving the posts and installing the substructure
- Module assembly and their strung together
- Installation of the inverters, DC-side connection
- Earthworks and the laying of the DC and AC cables
- Foundations for the transformers
- Measurement of the complete area