Projects roof

Cuppen, NetherlandsTEST

Project: Cuppen, Netherlands Partner: Xaam, Netherlands Power: 672.48 kWp Mounting system: Pitched roof PMT Hanger bolt 1,868 pcs. Modules with 360Wp are installed on the roofs. Many thanks to all. The project was realized smoothly.

Königswinter, GermanyTEST

Project: Königswinter, Germany Partner: Solmotion, Germany Output: 719.44 kWp Mounting system: PMT EVO 2.0 East/West 10° Another beautiful project that helps the energy transition. 2.116 modules were installed on the roofs in Königswinter, Germany, fed by Huawei Sun2000 60KTL. Many thanks for the trust Solmotion.

Viessmann, GermanyTEST

Project: Viessmann, Nagel Partner: Viessmann, Germany Output: 2,431.14 kWp Mounting system: PMT EVO 2.0 East/West 10° A beautiful project that was installed on a logistics center in Bochum. A total of 8,036 VitoVolt modules from Viessmann were installed on the roof and 19 SUN2000 - 100KTL inverters.Many thanks for the trust Viessmann.We are already looking forward to the next...

Waddinxveen, NetherlandsTEST

Project: Waddinxveen, Netherlands Partner: ZonXp, Netherlands Power: 1,364.40 kWp Mounting system: PMT EVO 2.0 East/West 10° A beautiful project in the Netherlands which we were able to implement for a very good partner. Many thanks for your confidence. In Waddinxveen 3.032 modules from Trina Solar Enery (TSM-DE17M) 450Wp were installed.the quality and safety is in the details 🙂....

Rotterdam, NetherlandsTEST

Project: Rotterdam, Netherlands Partner: ZonXP, Netherlands Power: 1.194,48 kWp Mounting System: PMT EVO 2.0 East/West 10° This beautiful project was realized in the port of Rotterdam. On the picture you can see the construction phase 1. we are also happy to install the construction phase 2, which is currently under construction.3.318 modules from Longi Solar,...

Ginsheim, GermanyTEST

Project: Ginsheim, Germany Partner: Avantag, Luxembourg Capacity: 745.62 kWp Mounting system: PMT EVO 2.0 East/West 10° The first construction phase with 745.62 kWp in Ginsheim has been completed.As with VGP Munich and VGP Dresden, the roof is so large that a good 2 MWp of system capacity can be installed. But due to the German EEG's unfortunately only 750...

Alpha Tec Dellach, AustriaTEST

Project: Alpha Tec, Dellach, Austria Partner: Selina Photovoltaik, Austria Output: 399.48 kWp Mounting system: PMT EVO 2.0 East/West It's great that we were able to build another project in Austria: a beautiful system on the AlphaTec building in idyllic Dellach. Here self-consumption is written BIG. We are proud that we were able to build this beautiful plant for...

FloraZon, NetherlandsTEST

Project: FloraZon, Netherlands Partner: OneSolar Power: 969.68 kWp Mounting system: PMT EVO 2.0 East/West 10° A beautiful project where the flowers are now transported by green electricity. The substructure was installed in such a way that an existing fall protection was integrated into the system. The ABB inverters were installed on a newly developed substructure with 3° inclination.

ARGE Paul Wagner et Fils - Avantag, LuxembourgTEST

Project: ARGE Paul Wagner et Fils - Avantag, Luxembourg Partner: ARGE Paul Wagner et Fils - Avantag, Luxembourg Capacity: 2,680.65 kWp Mounting system: PMT EVO 2.0 East/West 10° We are proud to have completed another project in Luxembourg for our partner Aventag. 8.510 modules from Ulica Solar were installed on the building of...

Avantag VGP DresdenTEST

Project: Dresden, Germany Partner: Avantag, Luxembourg Power: 745,29 kWp Mounting system: PMT EVO 2.0 East/West 10° The first construction phase with 745 kWp in Dresden is finished.Like VGP in Munich the roof is so big that you can install well 2 MWp.But because of the German EEG's unfortunately only 750 kWp can be built. Thank you very much...